Choose a topic to test your knowledge and improve your Project Management skills
Which of the following categories is part of the output of process?
The only deliverable work product for a successful project is the working program.
Which phase of the RUP is used to establish a business case for the system?
Which is a configuration management concept that helps us to control change without seriously impeding justifiable change?
Which one of the following is not a fundamental activity for processes in engineering ?
What combines procedures and tools to manage different versions of configuration objects that are created during the process?
The longer a fault exists in
Configuration Management can be administered in several ways. These include
A general statement of objectives is the major cause of failed efforts.
What complements the formal technical review by assessing a configuration object for characteristics that are generally not considered duringreview?
Which of the following is the process of assembling program components, data, and libraries, and then compiling and linking these to create anexecutable system?
Which of the following is not a Configuration Management Activity?
The definition and use of configuration management standards is essential for quality certification in
What involves preparing for external release and keeping track of the system versions that have been released for customer use?
Which two requirements are given priority during Requirement Management of a product ?
Considering the example of issue/return of a book, cataloging etc. in a library management.What type of management requirement is being depicted here?
Requirements Management has a high initial start-up cost but does not need ongoing funding throughout a project.
Requirements traceability is one of the most important part requirement management. It may also be referred to as the heart of requirement management.
Which of the following is a requirement management activity ?
What functionality of Requirement Management Tool (RMT) is depicted bythe statement: “the tool should be able to automatically detect relations between artifacts. For example information retrieval techniques, monitoring of change history, naming schemas or model transformations.”
Why is Requirements Management Important ? It is due to the changes
Requirements Management is a prerequisite forQuality-Oriented Development.
Which of the following is not a Requirement Management workbench tool?
According to a statisticalreport: “over 30% of all projects are cancelled before completion and over 70% of the remainder fail todeliver expected features”. What must be the reason for such a situation ?
“Devising and maintaining a workable scheme to accomplish the business need” is
Controlling the changes in the project may affect
Which of the following are parameters involved in computing the total cost of a development project?
Following is (are) the tool(s) for changing a process
Which of the following costs is not part of the total effort cost?
The COCOMO model takes into account different approaches to development, reuse, etc.
What is related to the overall functionality of the delivered ?
Identify, from among the following, the correctstatement.
A is developed using historical cost information that relates some metric to the project cost.
It is often difficult to estimate size at an early stage in a project when only a specification is available
Engineering:
Which model is used to compute the effort required to integrate reusable components or program code that is automatically generated by design or program translation tools?
The life cycle can be said to consist of a series of phases. The classical model is referred to as the waterfall model. Which phase may be defined as “The concept is explored and refined, and the client’s requirements are elicited?”
Which technique is applicable when other projects in the sameanalogy application domain have been completed?
Which model assumes that systems are created fromreusable components, scripting or database programming?
The final form of testing COTS is ………testing.
Which of the following states that work expands to fill the time available.
The individual or organisation who wants a product to be developed is known as the:
Which model is used during early stages of the system design afterthe requirements have been established?
Which of the following items should not be included in the project management plan?
In the maintenance phase the product must be tested against previous test cases. This is known as testing.
Which property of the rapid prototype is not important?
An example of the risk involved in development is
The degree of interaction between two modules is known as
The relationship between a derived class (or subclass) and base class is referred to as
Myers (1978) identifies seven levels of cohesion. Which level of cohesion may be defined as followed; “the output from one element in the component serves as input for some other element”?