Question:
____ is an example of short-term budget

1.Cash budget

2.Capital expenditure budget

3.Material budget

4.Both a & c

Posted Date:-2021-11-16 06:59:51


Question:
_____ budget is designed to remain unchanged irrespective of the volume of output or turnover attained.

1.Master

2.Fixed

3.Flexible

4.All of these

Posted Date:-2021-11-16 06:57:13


Question:
______ are costs which have been applied against revenue of particular accounting period.

1.Expenses

2.income

3.loss

4.None of these

Posted Date:-2021-11-16 07:03:53


Question:
______ is the maximum possible alternative earning that might have been earned if the productive capacity is put to some alternative use.

1.Opportunity

2.incremental revenue

3.alternative revenue

4.none of these

Posted Date:-2021-11-16 07:45:24


Question:
__________ is not the scope ofCost Accountancy.

1.Ascertaining cost

2.cost accounting

3.cost control

4.tax planning

Posted Date:-2021-11-16 07:01:55


Question:
A bill of material is prepared in case of a ______________ job

1.Standard job

2.non-standardized job

3.both a & b

4.none of these

Posted Date:-2021-11-16 07:06:44


Question:
An item of cost that is direct for one business may be _______ for another business.

1.Important

2.direct

3.Indirect

4.none of the above.

Posted Date:-2021-11-16 07:04:19


Question:
An unfavourable material price variance occurs because of:

1.Price increase in raw materials

2.Price decrease in raw materials

3.Less than anticipated normal wastage in the manufacturing process

4.More than anticipated normal wastage in the manufacturing process

Posted Date:-2021-11-16 06:59:23


Question:
Basis of apportionment of crèche expenses is _______

1.Number of employees

2.number of female employees

3.number of male employees

4.both b&c

Posted Date:-2021-11-16 08:00:33


Question:
Budgeting system ______ key managerial functions.

1.Dismisses

2.integrates

3.discharges

4.none of these

Posted Date:-2021-11-16 06:56:49


Question:
Contract costing is not used in one of the following industries.

1.Ship building

2.Civil Construction

3.Automobiles

4.Construction of Bridges

Posted Date:-2021-11-16 06:52:51


Question:
Cost Accounting has been developed because of _____ of Financial Accounting.

1.Limitations

2.advantages

3.both a & b

4.none of these

Posted Date:-2021-11-16 07:07:50


Question:
Cost accounting is based on ______________ figures.

1.Estimated

2.historical

3.actual

4.none of these.

Posted Date:-2021-11-16 07:08:16


Question:
Cost accounting provides detailed information about ______ of various products, processes, services and operations.

1.Costs

2.income

3.either a or b

4.None of these.

Posted Date:-2021-11-16 07:02:26


Question:
Cost centre and cost unit are ______

1.not the same

2.the same

3.not related

4.none of these

Posted Date:-2021-11-16 07:44:37


Question:
Cost of production is equal to ______

1.Works cost plus Administration Overheads

2.Prime cost plus Works cost

3.prime cost plus works overhead

4.works overhead plus administration overheads

Posted Date:-2021-11-16 07:42:46


Question:
Efficiency Ratio=

1.Number of actual working days in a period x 100 Number of working days in the budget period

2.Actual hours worked x 100 Budgeted hours

3.Standard hours for actual production x 100 Actual hours worked

4.Standard hours for actual production x 100 Budgeted standard hours

Posted Date:-2021-11-16 06:57:43


Question:
First in first out method of valuing material issues is suitable in times of ______

1.Rising prices

2.falling prices

3.fluctuating prices

4.none of these

Posted Date:-2021-11-16 07:05:39


Question:
Fixed cost per unit ______ with rise in output and ________ with fall in output.

1.Decreases, increases

2.increases, decreases

3.is constant, remains same

4.none of the above

Posted Date:-2021-11-16 07:03:27


Question:
Fixed cost per unit _______ with increase in output.

1.decreases

2.increases

3.changes

4.sometimes

Posted Date:-2021-11-16 07:47:49


Question:
In ______________ costing where standardized goods or services result from a sequence of repetitive and more or less continuous operations to which costs are collected and averaged over the units produced during the year:

1.Multiple

2.Process

3.Operation

4.single.

Posted Date:-2021-11-16 08:08:28


Question:
In time wage system, wages are paid according to the __________

1.Production

2.time

3.both a & b

4.None of these

Posted Date:-2021-11-16 07:56:20


Question:
In transport costing ____ charges vary more or less in direct proportion to kilometers run.

1.Running

2.petrol

3.drivers salary

4.tax

Posted Date:-2021-11-16 06:53:47


Question:
Inflated price method of valuing material issues is suitable when _____

1.Materials are subject to natural wastage

2.prices rise

3.prices fall

4.None of these

Posted Date:-2021-11-16 07:49:48


Question:
Inventory turnover in days = Days during the period ÷ ________

1.Inventory turnover ratio

2.material consumed during the period

3.cost of average stock during the period

4.none of these

Posted Date:-2021-11-16 07:54:22


Question:
Material control aims at achieving effective _____

1.Material management

2.quality control

3.accounting of material

4.material supply

Posted Date:-2021-11-16 07:48:37


Question:
Material Price Variance = Actual Usage ( ______________ )

1.Standard price

2.Standard unit price-actual unit price

3.Actual price

4.Standard usage

Posted Date:-2021-11-16 06:58:57


Question:
Printers use ______ costing.

1.Batch

2.Process

3.job

4.contract

Posted Date:-2021-11-16 08:03:57


Question:
Re-ordering level = ________ X Maximum re-order period

1.Average re-order period

2.Maximum usage

3.Maximum consumption

4.Normal usage

Posted Date:-2021-11-16 07:55:31


Question:
Service costing is not used in one of the following:

1.Electricity

2.Hospitals

3.transport

4.Electronics

Posted Date:-2021-11-16 06:54:11


Question:
Service costing is used in industries producing _________

1.Products

2.service

3.both a & b

4.None of these

Posted Date:-2021-11-16 07:01:23


Question:
Standard cost is a ______________ cost

1.Predetermined

2.historical

3.actual

4.final

Posted Date:-2021-11-16 06:58:06


Question:
Stock verification sheets are maintained to record the results of ________

1.Physical verification

2.financial control

3.financial verification

4.quality verification

Posted Date:-2021-11-16 07:05:14


Question:
Sunk costs are _______ for decision-making

1.irrelevant

2.relevant

3.useful

4.none of these.

Posted Date:-2021-11-16 07:02:52


Question:
The ______________ costing is applied when a quantity of similar and identical products are manufactured together as one Job.

1.Job

2.Batch

3.operation

4.output

Posted Date:-2021-11-16 08:06:31


Question:
The control ratios used by the management to know whether the deviations of the actual performance from the budgeted performance are favourable or unfavourable are _____

1.Capacity ratio, activity ratio

2.Efficiency ratio, calendar ratio

3.Both a & b

4.None of the above

Posted Date:-2021-11-16 07:00:24


Question:
The method of costing applied in biscuit industries is ______ costing and in steel industry _______ costing.

1.Job, process

2.job, contract

3.batch, multiple

4.process, operation

Posted Date:-2021-11-16 06:55:27


Question:
The per unit expense of the ______________ portion factory overhead varies with the volume of production while _____ portion remains the same with volume.

1.Fixed, variable

2.variable, fixed

3.variable, semi-variable

4.none of these

Posted Date:-2021-11-16 08:01:43


Question:
The quantity of material to be ordered at one time is known as _____

1.Ordering quantity

2.commercial order quantity

3.economic order quantity

4.none of these

Posted Date:-2021-11-16 07:50:46


Question:
The requirements of a particular job are known as ________

1.Job description

2.job specifications

3.job evaluation

4.Both a & b

Posted Date:-2021-11-16 07:55:57


Question:
The scope of cost accounting include _______, and ______

1.Cost ascertainment, cost presentation, cost control

2.tax planning, tax accounting, financial accounting

3.presentation of accounting information, creation of policy, day-to day operation

4.none of the above

Posted Date:-2021-11-16 07:00:55


Question:
The sum of value of work certified and uncertified appearing in the Contract Account is called _____

1.Work in Progress

2.Work in Process

3.Work Completed

4.Work done.

Posted Date:-2021-11-16 08:07:24


Question:
Under Merrick's multiple piece rate system, 110% of the ordinary piece rate is given to workers whose level of performance is between. of the standard output.

1.83% and 100%

2.100% and 120%

3.0% and 83%

4.none of these

Posted Date:-2021-11-16 07:58:34


Question:
Unsuccessful research expenditure should be ______ cost accounts.

1.Excluded from

2.included in

3.apportioned in

4.none of these

Posted Date:-2021-11-16 08:02:31


Question:
Variable costs change _______ with change in output.

1.Proportionately

2.Inversely

3.Disproportionately

4.Sometimes

Posted Date:-2021-11-16 07:04:47


Question:
Volume variance is divided into ______

1.Capacity variance, calendar variance and Expenditure variance

2.Capacity variance, calendar variance and efficiency variance

3.Capacity variance, expenditure variance and efficiency variance

4.Calendar variance, expenditure variance and efficiency variance

Posted Date:-2021-11-16 06:58:33


Question:
When 1000 units are 60% complete in a process, it is equivalent to _______ completed units.

1.60

2.600

3.6000

4.1000

Posted Date:-2021-11-16 06:55:57


Question:
When the actual loss is more than the estimated loss, the difference between the two is considered to be _________

1.Abnormal loss

2.normal loss

3.loss

4.none of these

Posted Date:-2021-11-16 08:08:54


Question:
Where actual loss in a process is less than the anticipated loss, the difference between the two is considered to be ______

1.Abnormal loss

2.normal loss

3.abnormal gain

4.normal gain

Posted Date:-2021-11-16 06:56:23


Question:
Where the work is undertaken to Customers' special requirements and each order is of comparatively short-duration, it is called _____ costing.

1.Job

2.batch

3.operation

4.output

Posted Date:-2021-11-16 06:51:55


More MCQS

  1. MBA Accounting MCQ Question Set 1
  2. MBA Accounting MCQ Question Set 2
  3. MBA Accounting MCQ Question Set 3
  4. MBA Accounting MCQ Question Set 4
  5. MBA Accounting MCQ Question Set 5
  6. MBA Accounting MCQ Question Set 6
  7. MBA Accounting MCQ Question Set 7
  8. MBA Accounting MCQ Question Set 8
  9. MBA Accounting MCQ Question Set 9
  10. MBA Accounting MCQ Question Set 10
  11. MBA Advertising and Sales Promotion Mcq Set 1
  12. MBA Advertising and Sales Promotion Mcq Set 2
  13. MBA Advertising and Sales Promotion Mcq Set 3
  14. MBA Advertising and Sales Promotion Mcq Set 4
  15. MBA Advertising and Sales Promotion Mcq Set 5
  16. MBA Advertising and Sales Promotion Mcq Set 6
  17. MBA Advertising and Sales Promotion Mcq Set 7
  18. MBA Advertising and Sales Promotion Mcq Set 8
  19. MBA Advertising and Sales Promotion Mcq Set 9
  20. MBA Advertising and Sales Promotion Mcq Set 10
  21. MBA Advertising and Sales Promotion Mcq Set 11
  22. MBA Advertising and Sales Promotion Mcq Set 12
  23. MBA Advertising and Sales Promotion Mcq Set 13
  24. MBA Behavioural and Allied Sciences MCQ Set 1
  25. MBA Behavioural and Allied Sciences MCQ Set 2
  26. MBA Behavioural and Allied Sciences MCQ Set 3
  27. MBA Behavioural and Allied Sciences MCQ Set 4
  28. MBA Behavioural and Allied Sciences MCQ Set 5
  29. MBA Behavioural and Allied Sciences MCQ Set 6
  30. MBA Behavioural and Allied Sciences MCQ Set 7
  31. MBA Behavioural and Allied Sciences MCQ Set 8
  32. MBA Behavioural and Allied Sciences MCQ Set 9
  33. MBA Behavioural and Allied Sciences MCQ Set 10
  34. MBA Brand Management MCQ Set 1
  35. MBA Brand Management MCQ Set 2
  36. MBA Brand Management MCQ Set 3
  37. MBA Brand Management MCQ Set 4
  38. MBA Brand Management MCQ Set 5
  39. MBA Business Communication MCQ Set 1
  40. MBA Business Communication MCQ Set 2
  41. MBA Business Communication MCQ Set 3
  42. MBA Business Communication MCQ Set 4
  43. MBA Business Communication MCQ Set 5
  44. MBA Business Communication MCQ Set 6
  45. MBA Business Communication MCQ Set 7
  46. MBA Business Communication MCQ Set 8
  47. MBA Business Communication MCQ Set 9
  48. MBA Brand Management MCQ Set 10
  49. MBA Brand Management MCQ Set 11
  50. MBA Business Economics MCQ Set 1
  51. MBA Business Economics MCQ Set 2
  52. MBA Business Economics MCQ Set 3
  53. MBA Business Economics MCQ Set 4
  54. MBA Business Economics MCQ Set 5
  55. MBA Business Economics MCQ Set 6
  56. MBA Business Environment MCQ Set 1
  57. MBA Business Environment MCQ Set 2
  58. MBA Business Environment MCQ Set 3
  59. MBA Business Environment MCQ Set 4
  60. MBA Business Environment MCQ Set 5
  61. MBA Business Environment MCQ Set 6
  62. MBA Business Environment MCQ Set 7
  63. MBA Business Environment MCQ Set 8
  64. MBA Business Environment MCQ Set 9
  65. MBA Business Ethics and Governance MCQ Set 1
  66. MBA Business Law Mcq Set 1
  67. MBA Business Law Mcq Set 2
  68. MBA Business Law Mcq Set 3
  69. MBA Business Law Mcq Set 4
  70. MBA Business Law Mcq Set 5
  71. MBA Business Law Mcq Set 6
  72. MBA Business Law Mcq Set 7
  73. MBA Business Law Mcq Set 8
  74. MBA Business Law Mcq Set 9
  75. MBA Business Mathematics Mcq Set 1
  76. MBA Business Mathematics Mcq Set 2
  77. MBA Business Mathematics Mcq Set 3
  78. MBA Business Mathematics Mcq Set 4
  79. MBA Business Mathematics Mcq Set 5
  80. MBA Business Mathematics Mcq Set 6
  81. MBA Business Statistics Mcq Set 1
  82. MBA Business Statistics Mcq Set 2
  83. MBA Computers In Management Mcq Set 1
  84. MBA Computers In Management Mcq Set 2
  85. MBA Computers In Management Mcq Set 3
  86. MBA Computers In Management Mcq Set 4
  87. MAB Cost and Managerial Accounting Mcq Set 1
  88. MBA Cost and Managerial Accounting Mcq Set 1
  89. MBA Cost and Managerial Accounting Mcq Set 2
  90. MBA Cost and Managerial Accounting Mcq Set 3
  91. MBA Cost and Managerial Accounting Mcq Set 4
  92. MBA Cost and Managerial Accounting Mcq Set 5
  93. MBA Cost and Managerial Accounting Mcq Set 6
  94. MBA Cost and Managerial Accounting Mcq Set 7
  95. MBA Cost and Managerial Accounting Mcq Set 8
  96. MBA Cost and Managerial Accounting Mcq Set 9
  97. MBA Cost and Managerial Accounting Mcq Set 10
  98. MBA Cost and Managerial Accounting Mcq Set 11
  99. MBA E-Business MCQ Set 1
  100. MBA E-Business MCQ Set 2
  101. MBA E-Business MCQ Set 3
  102. MBA E-Business MCQ Set 4
  103. MBA English Language MCQ Set 1
  104. MBA English Language MCQ Set 2
  105. MBA Entrepreneurship Management MCQ Set 1
  106. MBA Entrepreneurship Management MCQ Set 2
  107. MBA Entrepreneurship Management MCQ Set 3
  108. MBA Entrepreneurship Management MCQ Set 4
  109. MBA Entrepreneurship Management MCQ Set 5
  110. MBA Entrepreneurship Management MCQ Set 6
  111. MBA Financial Management MCQ Set 1
  112. MBA Financial Management MCQ Set 2
  113. MBA Financial Management MCQ Set 3
  114. MBA Financial Management MCQ Set 4
  115. MBA Financial Management MCQ Set 5
  116. MBA Financial Management MCQ Set 6
  117. MBA Financial Management MCQ Set 7
  118. MBA Financial Management MCQ Set 8
  119. MBA Financial Management MCQ Set 9
  120. MBA Financial Management MCQ Set 10
  121. MBA Financial Management MCQ Set 11
  122. MBA Financial Management MCQ Set 12
  123. MBA Human Resource Management Mcq Set 1
  124. MBA Human Resource Management Mcq Set 2
  125. MBA Human Resource Management Mcq Set 3
  126. MBA Human Resource Management Mcq Set 4
  127. MBA Human Resource Management Mcq Set 5
  128. MBA Human Resource Management Mcq Set 6
  129. MBA Human Resource Management Mcq Set 7
  130. MBA Human Resource Management Mcq Set 8
  131. MBA Insurance and Risk Management Mcq Set 1
  132. MBA Insurance and Risk Management Mcq Set 2
  133. MBA Insurance and Risk Management Mcq Set 3
  134. MBA Insurance and Risk Management Mcq Set 4
  135. MBA Insurance and Risk Management Mcq Set 5
  136. MBA Insurance and Risk Management Mcq Set 6
  137. MBA Management Information Systems Mcq Set 1
  138. MBA Management Information Systems Mcq Set 2
  139. MBA Management Information Systems Mcq Set 3
  140. MBA Management Information Systems Mcq Set 4
  141. MBA Management Information Systems Mcq Set 5
  142. MBA Management Information Systems Mcq Set 6
  143. MBA Management Information Systems Mcq Set 7
  144. MBA Management Information Systems Mcq Set 8
  145. MBA Management Information Systems Mcq Set 9
  146. MBA Marketing Management Mcq Set 1
  147. MBA Marketing Management Mcq Set 2
  148. MBA Marketing Management Mcq Set 3
  149. MBA Marketing Management Mcq Set 4
  150. MBA Marketing Management Mcq Set 5
  151. MBA Marketing Management Mcq Set 6
  152. MBA Marketing Management Mcq Set 7
  153. MBA Marketing Management Mcq Set 8
  154. MBA Marketing Management Mcq Set 9
  155. MBA Marketing Management Mcq Set 10
  156. MBA Marketing Management Mcq Set 11
  157. MBA Marketing Management Mcq Set 12
  158. MBA Marketing Management Mcq Set 13
  159. MBA Media Planning Mcq Set 1
  160. MBA Media Planning Mcq Set 2
  161. MBA Media Planning Mcq Set 3
  162. MBA Media Planning Mcq Set 4
  163. MBA Operations Research Mcq Set 1
  164. MBA Operations Research Mcq Set 2
  165. MBA Operations Research Mcq Set 3
  166. MBA Operations Research Mcq Set 4
  167. MBA Operations Research Mcq Set 5
  168. MBA Organisational Behavior Mcq Set 1
  169. MBA Organisational Behavior Mcq Set 2
  170. MBA Organisational Behavior Mcq Set 3
  171. MBA Organisational Behavior Mcq Set 4
  172. MBA Principles and Practices of Management Mcq Set 1
  173. MBA Principles and Practices of Management Mcq Set 2
  174. MBA Principles and Practices of Management Mcq Set 3
  175. MBA Principles and Practices of Management Mcq Set 4
  176. MBA Principles and Practices of Management Mcq Set 5
  177. MBA Principles and Practices of Management Mcq Set 6
  178. MBA Principles and Practices of Management Mcq Set 7
  179. MBA Principles and Practices of Management Mcq Set 8
  180. MBA Principles and Practices of Management Mcq Set 9
  181. MBA Production and Operations Management Mcq Set 1
  182. MBA Production and Operations Management Mcq Set 2
  183. MBA Production and Operations Management Mcq Set 3
  184. MBA Production and Operations Management Mcq Set 4
  185. MBA Production and Operations Management Mcq Set 5
  186. MBA Production and Operations Management Mcq Set 6
  187. MBA Production and Operations Management Mcq Set 7
  188. MBA Production and Operations Management Mcq Set 8
  189. MBA Production and Operations Management Mcq Set 9
  190. MBA Production and Operations Management Mcq Set 10
  191. MBA System Analysis and Design Mcq Set 1
  192. MBA System Analysis and Design Mcq Set 2
  193. MBA System Analysis and Design Mcq Set 3
  194. MBA System Analysis and Design Mcq Set 4
  195. MBA System Analysis and Design Mcq Set 5
  196. MBA System Analysis and Design Mcq Set 6
  197. MBA System Analysis and Design Mcq Set 7
  198. MBA System Analysis and Design Mcq Set 8
  199. MBA System Analysis and Design Mcq Set 9
  200. MBA Total Quality Management Mcq Set 1
  201. MBA Total Quality Management Mcq Set 2
  202. MBA Total Quality Management Mcq Set 3
  203. MBA Total Quality Management Mcq Set 4
  204. MBA Total Quality Management Mcq Set 5
  205. MBA Total Quality Management Mcq Set 6
  206. MBA Total Quality Management Mcq Set 7
  207. MBA Total Quality Management Mcq Set 8
Search
R4R Team
R4Rin Top Tutorials are Core Java,Hibernate ,Spring,Sturts.The content on R4R.in website is done by expert team not only with the help of books but along with the strong professional knowledge in all context like coding,designing, marketing,etc!